How long should I leave Contractors PVA before plastering?

How long should I leave Contractors PVA before plastering?

Allow the diluted primer coat of EVO-STIK Contractors PVA to dry completely. The neat bonding coat should be plastered over while still tacky and must not be allowed to dry. Depending on temperature, humidity and the surface, the open time is typically around 5 to 10 minutes.